Monday, July 29, 2013

A new floor and more

Today, at last, the concrete floor for the basement was poured.  This marks the beginning of the end, I hope, as the utilities can much more easily be reconnected once the floor is in.  Here is a shot of the lovely smooth basement floor...
 ...and an action shot of the stairs out of the basement being poured.
The front porch has now been almost completely rebuilt (see pic below), and we have our exterior electric hookup.  We're hoping Ameren will be coming tomorrow or Wednesday -- or at least sometime this week -- to return our power from the street.  Laclede is scheduled to lay a new gas line on Wednesday.  Tomorrow they are talking about putting the furnace back in its spot and starting to build the interior stairs.  Besides that, a plumber needs to come reconnect the water and gas pipes, and there's also the HVAC.  Oh, and a basement door and four windows.  Should be done by Friday, right???

No comments:

Post a Comment